One of the trucks is reversing through
the gate ... and many, many loads of soil were taken away !!
The blue paint on the side of the
pool indicates 'D' deep, 'M' medium and 'S' shallow
and assists the operator in excavating to the correct slope of
the pool
The first seat in the pool is starting
to take shape ...
... and here it is
.
The deep end is just about finished
...
.
... and sloping up to the medium
to shallow parts of the pool
Excavating and shaping the shallow
end
Now, in the photos below, the full
width seat ...
... and pool entrance are being
shaped
Also, at the bottom of the shot
below, you can see a deeper cut out in the bottom of the pool
and this is where the pressure valve will be positioned
Some shovel work to clean up ...
... and hey, look, a pool appears
out of the ground !!
The white pipe showing on the right
of this shot is part of the old sewerage connection ... have a
look at THIS page