The Swimming Pool

Relocating Pipes and Drains ... Page #01

sixteen photos

Wednesday 21st September 2011

Unfortunately the stormwater, mains water and sewerage pipes were under the ground right where the pool is to go !!

So these had to be relocated ...

... and the work was carried out by ...

Two points on the sewerage pipes had to be found where they would be cut and then redirected

and here is the first cut in the yard !!

The first point was found and now to find the second one

The blue line on the grass is where the pipes will be now located

The pipes have been found and cut ...

... so it's time to start digging the trenches

.

.

.

Eddie is ready to make one of the new connections

The pipes are now being laid ...

.

.

... and here is
one of the joins

A load of sand arrives ...

... which is to be packed around the pipes

.

The mains water pipe has been reconnected and this will now be in the same trench

The stormwater pipe is also ready for reconnection

Work has finished for the day

The sand has been packed around the straight lengths of pipes but all corners and new connections must be left exposed
so the Inspector from the Cairns City Council can check out and sign off on the work

After this, the trench can be backfilled