The 'New / Extended' Patio Area

... and now it's time to put on the Roof ... Page #01

The Back Channel

eighteen photos

Thursday 29th September 2011

Moving the tiles to allow access to the roof trusses

Fixing the back channel to the fascia

.

.

Here is a look at the roof trusses ...

... and these rafter brackets were fixed to the trusses and bolted through the fascia and the new back channel

NOTE - the downpipe showing in the next three photos is going to be repositioned

The tiles are now going back in place

This part of the work is now finished

A closer look at the back channel

The white spots are tek screws and the darker ones are the bolts going through to the rafter brackets

.

***************************************************************************

Friday 30th September 2011

The Beam and The Post

You can see the bracket on the ensuite wall just to the left of the window

and now Gary is getting the beam ready to raise ...

... and it goes from here ...

... to here ... done !!

The centre post is now in place

The blue chalk line on the fascia shows the roof line and fall ... and this been highlighted in the insert

The four shots below show the new patio from different angles

.

.

.

... and CLICK HERE to go to Page #02