The 'New / Extended' Patio Area

... and now it's time to put on the Roof ... Page #02

The "Roof / Insulation / Ceiling" Panels

nineteen photos

Monday 3rd October 2011

The side channel has been fixed to the fascia above the ensuite window and bedroom door

and now Mitch is getting the first panel ready ...

... and it's now in place !!

(the blanket was used to protect the ceiling finish when sliding the panel across the beam)

Shade in the New Patio !!

The second panel is now in place

The first light cable has been set into the insulation and fed through to the house ceiling ready for connection

Four panels and one light fitting are now finished ...

.

.

... and now five panels and both light fittings are done

It's like an "eclipse" happening in the backyard !!

.

.

In the two shots above you can see the 'old' outlet in the guttering
and in the two below the 'new' side outlet is in place
and this will have a spreader attached when the guttering is completed

Fixing the side channel ready for the last sheets

Six sheets are up and Gary is measuring up for the final piece ...

... and it is being slid into place

.

!!--The Roof Is Done--!!

The first piece of 'z-channel' is attached with the second sitting on the trestles ...

... and now that job is also finished

.

Below are four shots of the patio at the end of the day Still To Do
roof screws / final fixing
attached fascia
guttering and downpipe

.

.

.

... and CLICK HERE to go to Page #03