PAGE TWO
photo
#35 to #68
.
As was mentioned on the previous
page,
there were not enough plastic sleepers to finish all the edging
plus this section is going to be two rows high
The temporary timber edging shown here was installed so the job
could be completed
The crusher dust base begins to
arrive
.
.
.
A look at the ocean on a windy day
...
... and the tide is on it's way
in
... and here is the Lunch Room ...
Equipment Department ... Transport Division !!
Continuing to spread and level the
crusher dust
.
.
.
As can be seen in the following
photos, the next job was concreting around this power/water box
and all the equipment support posts and along all the edges ...
when laid, the astro turf will be glued to this concrete
.
.
.
.
.